COMPANY PROFILE
OF
DIGITAL SURVEY COMPANY (DSC)
Digital survey company (DSC) is established in January 2009. In a short time the company has got a lot of reputation for it`s Perfect service. We have a trained, creative and dynamic group of employer. Most of them are so much experienced in many big and important project of Gas transmission company limited, Power Grid Company of Bangladesh limited, Power Development Boar, Roads and High Way Department,LGED, Rajdhani Unnayan Kartripakkha, Bangladesh Police Project (Master plan) and other project of other authority. Specially the company is engage in power sector. The proprietor and technical director has about 15 years survey experience in Topographical Survey. Gas transmission & Power Transmission, Water Pipe, Digital Survey etc. Now, the company is one of the most well-known Engineering survey company of Bangladesh.
Our Manpower list
Survey Advisor : Md . Mohidur Rahaman Khan Kazol B.sc Engineering (Civil) BIT Dhaka, Gazipur, Bangladesh
Proprietor & Technical Director : Md. Jahandar ali khan (Tokon) Diploma in Survey Engineering,Rajshahi Survey Institute
MBA (Major in Accounting) Jagannath University, Dhaka
GIS & Auto Cad Specialist: Md. Torikul Islam
M.S.S Computer & Social Science National University.
Surveyor : Md. Abdul Alim ,Diploma in Survey Engineering Rajshahi Survey Institute
Surveyor : Md. Josimuddin
Surveyor : Md. Milon Miah
Our Service
(1)Detailed Digital Topographical Survey
(2) Land/Hill/River/Contour Survey
(3) GPS
(4) GIS Data Base
(5) DGPS/RTK
(6) Total Station
(7) Auto cad
(8) Earth Measurement
(9) Hydrographical Survey
(10)All Kids of Survey
(11) Consultancy
1. RTK base line survey and topographic survey.
2. Static survey For Bench Mark establishment GEOID Model Development.
3. spot level survey and regular data processing.
4. field survey management and quality control. Planning & schedule day to day survey works.
5. Alignment survey by GPS, spot level survey, BM fly and cross-section of river by level machine
6. Land use survey of Urban and Rural area by advance d survey equipment
7. Detailed route survey using Level Machine and Total Station.
8. Ground Control Point (GCP) collection using Differential Global Positioning System (DGPS).
9. Creating Map from collected field data using Auto CAD/GIS/Arc view/Macros/PLSCAD software, and all kinds of engineering survey.
Using Equipment
Φ Total Station (Topcon, Sokkia Power Set, Sokkia 2c 11, 3F Pan tax)
Φ RTK GPS (Trimble 4000ssi, 4000se, 4700) (Rental)
Φ Level Machine (Topcon, Sokkia, Pan Tax, Current Meter)
Φ Path finder (Trimble Pro-XR Data Logger)(Rental)
Φ Hand GPS (Gramen, Magellan Sports, Etrex)_
Φ Current Meter (Dnc-3, Veleport,) (Rental)
Φ Echo Sounder (Deso-14) (Rental)
Φ DGPS
Item No- 1
Establishment of BM ( Bench Mark) / Control Point (CP) Establishment of Co-ordinates of BMCP ( Northing in meter Easting in meter, Reduce Level M.MPWD) BM pillar Shall be misdialed by project authority GPS base line survey in static mode and network Adjustment technique should be used for establishing Northing and Easting.
Figure: (Bench Mark) Location in Parbotipur, Dinajpur
Teesta Project.
1st order level BM Carry
survey should be conducted for
Establishing Reduce level in mPWD Survey of Bangladesh(SoB) BM available near
project area should be used Establishing my co- ordinates.
Figure: River/Khal
Cross Section Survey of Level Machine.
Item No- 2
Detail Digital Topographic & physical feature survey based on Total station (TS) based on detailed topographic & physical feature survey of the project area. The survey will cover the location and alignment of all topographic features inside the project area such as :all Roads, River, khal, Rail Line, Ponds, Trees,(Forest Area Located),Electric line, house and others, existing physical features such as structures, utility network etc, spot land levels of the project area will be 20m intervals surveyed for the level machine .GPS fast static Survey Technique should be used for establishing secondary control points to support the total station survey. Total station (TS) shall be used for Spot level, detailed physical feature and infrastructures survey.
Figure: Topographical Survey by Total Station in
Irrigation project, Rangpur.
Figure:
Surveyor Tokon, Executive Director, Giasuddin Ahmed Choudhury & Engineers
(CEGIS)
Figure: GPS Survey 132kv T/L of Sylhet-Bianibazar Project. Mr.Worng ,Mr.lee(Chinese)& Mr. Tokon.
Figure : Visit for (Total Station Survey) Detail Area Plan(DAP) RAJUK
Figure: Topographical Survey by
Total Station in Sylhet Electronics City by Bangladesh hi-tech-park Authority
Figure: 230kv Transmission Line Survey & Tower Plotting Map Abul Kheir Group Project. Approved By PGCB.
Figure: Sport Level Survey 20X20m Interval, Grid
Line The Project KEPZ at Anowera,
Chittagong.
Figure: Topographical Survey by Total Station in Sylhet Electronics City by Bangladesh hi-tech-park Authority
Figure: A Mitting for Topographical &Master Plan Project at UDD Office, Dhaka.
Figure: Ashuegonj 230/132kv Sub-Station Digital Survey Map Surveyed By Digital Survey Company, Client: Power Development Board Bangladesh.
Figure: Road & Water Pipe Line Network Map
Surveyed By Digital Survey Company
Client: Asian Arsenic Network.
Figure: Contour Map (0.5m interval) at Maymensingh Surveyed By Digital Survey Company. Client: Sun-Edson
Figure: Detailed
Topographical, Spot Level Survey Map (Police Master Plan Project) at Rangpur
Police Training Center, Surveyed By Digital Survey Company. Client: Bangladesh Police.